Current & Anticipated Construction Projects

When an addition is made to this page that is expected to have a significant impact on the public, the City will post to the News Flash. Sign up for Public Notices, Updates & Alerts to receive email notifications.

Project Name
Project Description
Anticipated Timeline
Notes
Broadway Pedestrian ImprovementsProject includes ADA ramp upgrades and sidewalk installation from Cash Corner to Bug Light and realignment of the Hill St and Broadway intersection.April 2026-September 2026Plan impacts have been submitted to Maine DOT to start the right-of-way process. Contact Public Works for more information: 767-7635
Broadway Sidewalk (Whitehall to Church)Installation of 5' sidewalk along Broadway from Whitehall Avenue to Church Street. Includes ADA ramp upgrades and crosswalk striping.June 2025 - August 2025This project is funded by the Maine DOT Municipal Partnership Initiative (MPI). Contact Public Works for more information: 767-7635
Church St SidewalkInstallation of 5' sidewalk along Church Street from Broadway to Lincoln Street. Includes ADA ramp upgrades and crosswalk striping. June 2025 - August 2025This project is funded by a Community Development Block Grant. Contact Public Works for more information: 767-7635
Eastern Trail Extension - Close the GapExtension of the Eastern Trail from Wainwright field to Blackpoint Rd in Scarborough.Winter 2025-Summer 2025Project is currently being administered by Town of Scarborough and the MDOT. Contact Public Works for more information: 767-7635 or visit the "Close the Gap" website
Lincoln Street Multi-Use PathInstallation of a 10-ft multi-use path to connect the Greenbelt from the intersection of Broadway and Evans to Veterans Memorial Bridge along Broadway and Lincoln.Spring 2026-Fall 2026This project is administered by South Portland and Maine DOT. Contact Public Works for more information: 767-7635
Local Road PavingReclamation and paving of the following streets: 
  • Mussey St. (Broadway to Pine)
  • Erskine Dr. (Casco Bay Bridge to Waterman Dr.)
April 2025 - June 2025This project may cause localized traffic impacts. We recommend seeking alternative routes if impacted. Contact Public Works for more information: 767-7635

Reclamation and paving of the following streets: 
  • Bonnybriar (dead end to Evans)
  • Braeburn Ave (Aspen to Westbrook)
  • Deake (Preble to dead end)
  • Elmwood (Anthoine to dead end)
  • Fairlawn (Cottage to Mitchell)
  • Margaret (Broadway to Third)
  • Mitchell (Cottage to Cape line)
  • Wescott (Broadway to Westbrook)
July 2025 - November 2025This project may cause localized traffic impacts. We recommend seeking alternative routes if impacted. Contact Public Works for more information: 767-7635

Reclamation and paving of the following streets:
  • Brenton (dead end to Ocean)
  • Kincaid (Sawyer to Stanford)
  • Orlando (Broadway to dead end)
April 2026 - June 2026This project may cause localized traffic impacts. We recommend seeking alternative routes if impacted. Contact Public Works for more information: 767-7635
Main Street Pump Station Force Main ReplacementReplacement of the Main Street pump station force main located on Main Street from end to Lincoln Street and ending at Lincoln St & Lawn Ave.July 2025-November 2025This project will be constructed if funded by the City's 2026 Capital Improvement Plan. Contact Water Resource Protection for more information: 767-7675
Sewer and Storm Drain LiningUltraviolet cured cast in place pipe lining of sewer pipes located on Broadway, Alfred St, Sawyer St, Craggmere Ave, Thompson St, Myrtle Ave, Preble St, Elmwood Ave, Coolidge Ave, and Harbor View Ave. December 2024-June 2025Traffic impacts should be minimal. Sewer pipe lining is accessed above ground and does not require excavation. Contact Water Resource Protection for more information: 767-7675
West High Pump Station Force Main ReplacementReplacement of the West High pump station force main located on the eastern end High Street, going cross country to Mussey Street and ending past Second Street. July 2025-November 2025This project will be constructed if funded by the City's 2026 Capital Improvement Plan. Contact Water Resource Protection for more information: 767-7675